Improvements and corrections to the cost simulator


Several improvements and corrections have been made to the cost simulator: 

  • Improved calculation of the carrier step by tree structure
  • Correction of calculation errors
  • More precise breakdown of workforce by branch
  • Clear error on ELP whose carrier step does not belong to the tree structure 
  • Teaching hours fields can be blocked by the control workflow
  • The "Teaching hours" field can be blocked by the control workflow without any side-effects.
  • Original details on log messages

For more information on the cost simulator, please visit this page

Back to top